Remodeling glossary: the terms in your quote and contract

Most confusion in a remodel comes from a few words: an allowance (a placeholder budget for items you pick later), a change order (a written change to scope and price), a lien waiver (a release that a contractor or supplier has been paid), and in cost reports, the share of cost recouped (how much of the job cost agents think it adds at resale). This page defines those and about 20 more in plain English.

Quotes and contracts use trade shorthand. Knowing these words lets you compare quotes on the same terms and spot what a contract leaves out.

Quote and contract terms

Allowance
A placeholder amount in a quote for items you will choose later, such as tile or light fixtures. If your choice costs more, the price goes up. Low allowances can make a quote look cheaper than it is.
Change order
A written change to the scope, price or schedule, signed by you and the contractor before the extra work starts.
Contingency
Money you set aside, outside the contract price, for surprises such as rot or old wiring found when walls open. It is your planning choice, not a fee. Our budget calculator starts at 10% as an editable setting.
Draw schedule (payment schedule)
When you pay, and how much. A schedule tied to finished stages of work protects you better than one tied to dates.
Retainage
A share of the price held back until the job is fully finished, including punch-list items.
Punch list
The list of small items to fix or finish before final payment.
Lien waiver (lien release)
A signed statement that a contractor, subcontractor or supplier has been paid and gives up its right to file a lien on your home for that amount. Rules on liens differ by state.
Mechanic's lien
A legal claim against a property by someone who worked on it or supplied materials and was not paid. It can be filed even if you paid your general contractor, if the contractor didn't pay a supplier, which is why lien waivers matter.
Scope of work
The written description of exactly what will be done and with what materials. Comparing quotes only works when the scopes match.
License, bond and insurance
Three different things. A license is permission from the state or locality to do the work; a bond is a guarantee that can pay claims if the contractor fails to meet certain obligations; liability insurance covers damage the contractor causes. See your state's licensing rules and lookup.

Permit and code terms

Building permit
Approval from your city or county before certain work starts, followed by inspections. See do I need a permit.
IRC R105.2
The section of the International Residential Code that lists work exempt from a permit, such as painting, tiling, cabinets and countertops. Local governments adopt and amend it.
Final inspection
The last inspection that closes the permit. Make final payment depend on it passing.

Cost report terms

Job cost
In the Cost vs. Value Report, the estimated price of a defined project, built to a published specification, in a given region.
Resale value
How much real estate professionals surveyed for the report think the project adds to a home's value at sale.
Cost recouped
Resale value divided by job cost. Over 100% means the project, on average, adds more value than it costs.
Midrange and upscale
The report's two finish levels. Midrange uses standard, mid-priced materials; upscale uses premium materials and often enlarges or reconfigures the space.
Minor vs major kitchen remodel
A minor remodel keeps the cabinet boxes and layout of a 200-square-foot kitchen; a major one replaces everything and adds an island. See kitchen remodel cost.

Roof, window and siding terms

Square
100 square feet of roof (or siding) surface. Roofers price per square.
Tear-off
Removing the old roofing down to the deck before installing new roofing, as opposed to laying a new layer over the old.
Pitch (slope)
How steep a roof is, written as inches of rise per 12 inches of run, such as 6 in 12. Steeper roofs have more area for the same footprint; our roof calculator does the math.
Standing seam
Metal roofing made of long panels joined by raised, interlocking seams.
Double-hung window
A window with two sashes that both slide up and down. The Cost vs. Value window projects use 3 x 5 foot double-hung units.
Fiber-cement siding
Siding boards made with cement and fibers, an alternative to vinyl or wood. Compared with vinyl in siding replacement cost.
Universal design
Design that works for people of all ages and abilities, such as a curbless shower, grab bars and wider doorways.

Frequently asked questions

What is an allowance in a remodeling contract?

A set amount the contractor includes for items not yet chosen, such as tile, fixtures or lighting. If you pick something that costs more, you pay the difference, so check that allowances match what you actually plan to buy.

What is a change order?

A written, signed change to the contract's scope, price or schedule. Ask for one before any extra work starts, so the price is agreed in writing.

What does cost recouped mean?

In the Cost vs. Value Report, the resale value a project adds divided by its job cost. A project that costs $20,000 and adds $15,000 of value recouped 75%.

How big is a roofing square?

100 square feet of roof surface. A 3,000-square-foot roof, the size priced in the Cost vs. Value Report, is 30 squares.

Ready to price your project?

Answer a few quick questions about your project. Local remodeling and roofing contractors can give you real quotes for your home.

Get local quotes Free and no obligation. Takes about a minute.

Sources

  1. JLC, 2025 Cost vs. Value methodology, checked 2026-11-27
  2. JLC, Cost vs. Value project descriptions: windows, roofing, siding, checked 2026-11-27
  3. JLC, Cost vs. Value project descriptions: kitchens, checked 2026-11-27
  4. City of Federal Way, WA, Residential permit exemptions (IRC Section R105.2 as adopted locally), checked 2026-11-27